EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EH-SlingTSI
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (112)
Research
- (3)
Workshop
- (1)
Empennage
- (30)
Fuselage
- (19)
Firewall
- (2)
Tail Feathers
Wings
- (11)
Controls
- (10)
Avionics
- (4)
Lighting
Instrument Panel
Landing Gear
- (1)
Engine
- (2)
Propeller
Fuel System
Interior Finish
- (2)
Paint / Decals
- (1)
Inspection
- (2)
Tools
- (9)
-
Built some tables,...
-
Just a quick...
-
Right angle drill head
-
Build the Sling wing...
-
Shortening the Rivets
-
Difference between...
-
Finally broke down...
-
Needed new Rivet gun...
-
Catch all for tools
Overall
- (8)
Seats
- (7)
Builder Name:
Edward Hefter
-
Project:
SlingTSI
-
VIEW REPORTS
Total Hours:
478.65
Total Flight Time:
Start/Last Date:
Sep 22, 2020 - No Finish Date
Engine:
Rotax 915iS
Propeller:
Airmaster 3 Blade Constant Speed propeller
Panel:
G3X
Friendly URL:
https://eaabuilderslog.org?s=EH-SlingTSI
Home or Last Project Picture
Feb 01, 2021
Catch all for tools
- (4 hours)
Category: Tools
I've been scouring eBay for Clecos and the ProsetXT2 rivet puller. I also got a regular hand-operate rivet puller and some other odds and ends. This entry is my best guess as to what all that has cost so far.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.